Contact us

SPS Microgrids successfully installed a 157kWp Solar PV system on a serviced office building. The client’s business model involved multiple occupants in a fully serviced office space, resulting in the client being responsible for all electricity bills. Unfortunately, recent electricity price increases significantly impacted their overheads. To address this challenge, the client opted for a PV solution, which not only reduced their energy bills by over 25% but also provided protection against future energy cost rises. Additionally, the installation allowed the building’s occupants to benefit from the company’s commitment to sustainable practices.

Thanks to favourable contractual rates, the client can expect a payback period of just 3.5 years. Beyond that, they will enjoy substantial cost savings with significantly reduced energy bills. This successful implementation showcases the client’s dedication to both financial and environmental sustainability. Additionally the annual generation equates to a CO2 reduction of 19,040 kg per annum.

Install Capacity

157kWp

Ann. Generation

126,160 kWh

Ann. Saving

£44,045.13

Ann. CO2 Reduction

19,040 kg

Get a FREE Solar Quote

Complete the form below for a free quote and join thousands saving up to £800 a year on their energy!

Quick Solar Quote - Header

"*" indicates required fields

Name*

Want to take control of your energy costs and create change?

Get a free solar quote today!

I E S Cen­tre, County Durham

This project is comprised of a 237 kWp solar panel system mounted on a number of flat roofs at the I E S Cen­tre in County Durham.

Read case study

Scottish National Mining Museum

This project is comprised of a 10.00 kWp solar panel system with battery storage at the Scottish National Mining Museum.

Read case study

Hillthorn Business Park, Washington

This is the largest speculative industrial development in the North East boasting 600,000 sq ft of the highest quality industrial buildings strategically located alongside the A19.

Read case study