Contact us

SPS has worked with the National Mining Museum and Midlothian Council to model a Solar PV system on the old office. The Museum is struggling to keep up with rising costs and Solar PV and Battery will pro­vide much needed relief. This case is unique as we have been granted permission to install on a Grade A listed building.

Once planning permission was granted, we were able to installed a 10.00 kWp Solar PV System with a 15 kWh Battery Storage Unit. This has drastically decreased their Energy Bills and dependence on the National Grid and by making the building 98.81% self-sufficient.

Install Capacity

10.00 kWp

Ann. Generation

8,894 kWh

Ann. Saving

£5,682.24

Ann. CO2 Reduction

1,428 kg

Testimonials

"SPS have just installed new solar panels at the National Mining Museum Scotland in Newtongrange. They provided an excellent service and very patient with us dealing with planning permission and building warrant. They were very helpful providing all the information for the installation. Got on great with the tram, always helpful and friendly."

Ritchie Poole

Facilities Manager at National Mining Museum Scotland

Get a FREE Solar Quote

Complete the form below for a free quote and join thousands saving up to £800 a year on their energy!

Quick Solar Quote - Header

"*" indicates required fields

Name*

Want to take control of your energy costs and create change?

Get a free solar quote today!

I E S Cen­tre, County Durham

This project is comprised of a 237 kWp solar panel system mounted on a number of flat roofs at the I E S Cen­tre in County Durham.

Read case study

Hillthorn Business Park, Washington

This is the largest speculative industrial development in the North East boasting 600,000 sq ft of the highest quality industrial buildings strategically located alongside the A19.

Read case study

James Burrell, Stockton-on-Tees

This project is comprised of a 68.88 kWp solar panel system mounted on the warehouse roof of James Burrells Builders Merchant in Teesside.

Read case study