Contact us

This project involved the installation of 56kWp roof mounted Solar PV system over two separate roof faces.

A key component of this solution is the enhanced smart control software which allows our client to continually monitoring its energy generation and consumption The system we installed provided the client with over a 60% reduction in their energy bills.

Install Capacity

56 kWp

Annual Generation

47,011 kWh

Annual Saving

£18,537

Ann. CO2 Reduction

5,130 kg

Testimonials

“When you consider the benefits I’m getting, you have to wonder why every business isn’t installing solar. The return on investment with solar is phenomenal. The reasonable cost of the install and the significant levels of power generated contribute to lowering our overall energy cost. This means our system will be paid off quickly making a notable impact on our bottom-line profitability. Tony and Moe provide an end-to-end solar solution for businesses unmatched by others. From our initial enquiry, installation, questions throughout and follow up, they were there every step of the way making the whole process very simple. I am now working with them on other properties and they’re currently looking into an EV charging solution for us. I highly recommend the SPS microgrids team for all your renewable energy needs.”

Mick Thorburn

Director at AA Construction

Want to take control of your energy costs and create change?

Get a free solar quote today!

Quick Solar Quote

"*" indicates required fields

Name*

I E S Cen­tre, County Durham

This project is comprised of a 237 kWp solar panel system mounted on a number of flat roofs at the I E S Cen­tre in County Durham.

Read case study

Scottish National Mining Museum

This project is comprised of a 10.00 kWp solar panel system with battery storage at the Scottish National Mining Museum.

Read case study

Hillthorn Business Park, Washington

This is the largest speculative industrial development in the North East boasting 600,000 sq ft of the highest quality industrial buildings strategically located alongside the A19.

Read case study