This project at the Gosforth Civic Theatre comprised of a 24.6kWp solar panel system using an East West Non-Penetrative System, ideal to use on flat roofs when you don’t want to affect the watertight surface and maintain any manufacturing roof warranties.

After signing a new 50-year lease on Gosforth Civic Theatre, the Newcastle-based performing arts charity Liberdade secured funding for building improvements from several large National foundations. The work on the building on Regent Farm Road was to take place in two stages. The first phase, which is now complete saw the auditorium roof replaced, insulation and sound-proofing installed and the existing bar area expanded. SPS microgrids was bought in during this phase to install a 24.6kWp Solar PV system. With the client being a charity, it was imperative SPS microgrids design a system to help minimise the ongoing financial burden of contiguously rising energy costs. The Gosforth Civic Theatre will now benefit from an energy import reduction of over 30% from the national grid.

Thanks to favourable contractual rates, the client can expect a payback period of just 3.5 years. Beyond that, they will enjoy substantial cost savings with significantly reduced energy bills. This successful implementation showcases the client’s dedication to both financial and environmental sustainability. Additionally the annual generation equates to a CO2 reduction of 3,820 kg per annum.

Install Capacity

24.6 kWp

Ann. Generation

22,608 kWh

Ann. Saving

£17,093.48

Ann. CO2 Reduction

3,820 kg

Get a FREE Solar Quote

Complete the form below for a free quote and join thousands saving up to £800 a year on their energy!

Quick Solar Quote - Header

"*" indicates required fields

Name*

Want to take control of your energy costs and create change?

Get a free solar quote today!

I E S Cen­tre, County Durham

This project is comprised of a 237 kWp solar panel system mounted on a number of flat roofs at the I E S Cen­tre in County Durham.

Read case study

Scottish National Mining Museum

This project is comprised of a 10.00 kWp solar panel system with battery storage at the Scottish National Mining Museum.

Read case study

Hillthorn Business Park, Washington

This is the largest speculative industrial development in the North East boasting 600,000 sq ft of the highest quality industrial buildings strategically located alongside the A19.

Read case study